                        南通某污水处理厂工程项目施工组织设计
工程概况:  
本工程位于南通通州区某镇,是南通通州区某镇污水处理厂“BOT”投资项目的一期工程。本工程设计处理能力5000吨/日(公用部分按25000吨/天),占地面积约10000平方米。
资料目录
目    录
第一章 施工组织设计编制说明·······························5
1.1 编制原则···········································5
1.2 编制依据···········································5
1.3 招标范围···········································5
1.4 组织施工的原则及要求·······························6
1.5 执行的施工规范·····································6
1.6 执行的施工技术操作规程·····························7
第二章 工程概况及简要说明·································8
2.1 一般情况···········································8
2.2 建筑设计要求······································ 9
2.3 结构设计要求······································10
第三章 工程管理目标及施工部署····························11
3.1 原则要求··········································11
3.2 控制目标··········································11
3.3 施工部署··········································12
第四章 施工管理组织体系··································13
4.1 项目管理机构设置··································13
4.2 岗位职责··········································14
4.3 主要人员简历及证件································18
第五章 资源需求计划······································24
5.1 劳动力需求计划····································24
5.2 主要材料需求计划··································24
5.3 主要机械设备需求计划·····························25
第六章 施工准备及现场总平面布置··························27
6.1 技术准备··········································27
6.2 生产准备··········································28
6.3 现场布置原则······································29
6.4 施工水、电计划····································30
6.5 施工现场总平面布置································32
第七章 施工总进度控制计划及工期保证措施·················· 36
7.1 工期控制原则······································36
7.2 施工总进度计划····································36
7.3 工期保证措施······································36
第八章 各主要分部项施工方法用措施························38
8.1 工程施工测量······································38
8.2 土方工程开挖及降排水施工··························40
8.3 基础验收及土方回填································42
8.4 基础工程··········································42
8.5 主体结构工程施工··································43
8.6 钢筋工程··········································49
8.7 砼工程············································53
8.8 砖砌工程··········································60
8.9 脚手架施工方法····································63
8.10屋面工程··········································64
8.11防水工程··········································65
8.12门窗工程··········································69
8.13楼地面施工方法····································72
8.14装饰工程··········································74
8.15垂直运输··········································80
第九章 水电气施工方法···································· 81
9.1 管道专业的施工要点································81
9.2 管道专业的施工方法································81
9.3 电气专业的施工要点································83
9.4 电气专业的施工方法································84
第十章 质量保证措施······································ 87
10.1 质量保证组织体系··································87
10.2 技术管理措施······································90
10.3 施工准备阶段的质量管理····························90
10.4 施工阶段的质量管理································91
10.5 竣工后服务········································92
10.6 保证施工的配合管理·································92
10.7 建筑材料的管理措施·······························93
10.8 计量管理·········································95
第十一章 安全保证措施··································· 96
11.1 安全管理的组织措施·······························96
11.2 安全生产部署·····································97
11.3 施工机械(具)的安全·······························98
11.4 施工用电安全·····································100
11.5 外架子的安全技术·································102
11.6 其它安全措施·····································103
第十二章 特殊季节施工措施······························· 105
12.1 冬季施工·········································105
12.2 雨季施工·········································105
12.3 夜间施工·········································106
第十三章 施工现场综合管理·······························107
13.1 组织落实·········································107
13.2 施工现场文明措施·································107
13.3 环境卫生管理·····································108
13.4 防止大气污染·····································108
第十四章 降低成本措施···································109
14.1 降低管理措施·····································109

编辑评价
本施工组织设计内容编制详细,符合施工组织设计规范,可作施工组织设计范本在施工组织方案编制过程中供工程师进行参考使用!